Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Select your service

  2. Select the size range for your pipe

  3. Select the drawing tool

    • Make sure it is highlighted green

  4. Tap and drag to draw your pipe

...

Pulling Tees/Olets:

  1. Have your base branch already drawn

  2. Tap the tee/olet button on the right-hand side to pick your priority

  3. Select the size of the pipe you want to pull off with

  4. Tap the middle of the pipe and hold and drag to create a tee or olet

    1. Small pipe sizes will also put in a reducing tee

...

Placing in Valves/Fittings:

  1. Have your base branch already drawn

  2. Select your menu on the left where the valve or fitting is

  3. Select your valve/fitting from the menu

  4. Place valve/fitting on the end of the pipe or cut into the pipe

...