Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Project Divisions are associated with a specific project and will display along with Company Divisions if the project is referenced. See the Divisions (Admin) article for information about Company-level Divisions.  

The Project-level

Divisions are supported in: Containers, Purchasing, and Scan.

Division will be included in the following pages:

  • Packages > Dashboard

  • Assemblies > Dashboard

  • Containers > Assign > Tracking

  • Scan

Project-level Divisions are not supported in: Tasks, Stations, Shops, and Jobsites.

Table of Contents
excludeRelated Articles

Configure

To configure and use a Project-level Division:

  1. Go to Admin > Project > Divisions, click the new division plus icon, enter the Division name (Ex. Project 38553 Division) and save. The new Project-level Division will display and the only Phase option is Field.

    Image Added


    1. Division (Required) - The name of the Project-level Division.

    2. Address (Optional) - The Country, Address, City, State, and Zip are used to define the address of the Project-level Division.

    3. Phase - By default, STRATUS includes Divisions aligned to four project phases, Office, Purchasing, Shop, or Field. A Project-level Division can only be set to Field

.Image Removed
    1. .

    2. Field Orderz Division - Not currently used in STRATUS.

    3. Notes - Add notes to better understand the purpose of the Division.

  1. Once Saved, the Project-level Division will display if the associated project is selected. Below are some examples:

    1. Containers

      1. Project-level Divisions can be used on pages like Containers (Assign), Scan, and Packages. Note: Before the Project-level Division (Ex. Project 38553 Division) will display in the Division drop-down, a Status has to be set and a part, assembly, or package (Ex. 38553-DIM-0002) from the project must have been added to the Contents of the Container (Ex. Pallet 03).

Image Removed
      1. Image Added


    1. Scan

      1. After an item has been scanned, it’s Project-level Division can be selected.

Image Removed
      1. Image Added